服务热线:400-635-0567

空调检测

发布时间:2024-05-27 17:49:26 - 更新时间:2024年06月29日 15:22

点击量:0

军工检测 其他检测

TB/T 1804-2017 铁道车辆 机组

KS C 9306-2017

Air conditioners

KS C 9306-2017(2022

Air conditioners

TB/T 3493-2017 铁道车辆 压力保护装置

ASHRAE EQUIP SI CH 49-2008 室内和已包装终端

ROOM AIR CONDITIONERS AND PACKAGED TERMINAL AIR CONDITIONERS

CJ/T 134-2001 城市公交客车系统技术条件

The technical requirements for the air-conditioning system of urban transit buses

PN M52017-1986 技术设备..基本参数系列

Air technology installations Air conditioners Basic parameters series

ABNT NB-10-1951 设施

1. Esta Norma tem por objetivo estabelecer bases fundamentais para execu??o de instala??es de condicionamento de ar. As condi??es aqui estabelecidas s

BOCA IMC-2000 CHAPTER 12-2000 管路

APPENDIX A SYSTEM LAYOUT ILLUSTRATIONS

Hydronic Piping

BOCA IOTFDC-1998 CHAPTER 25-1998 管路

This appendix contains various illustrations and diagrams of typical applications of specific code provisions to one- and two-family dwellings

Hydronic Piping

BOCA CHAPTER 7 NMC-1993 管路

It shall be unlawful to interfere with, attempt to interfere with, conspire to interfere with, obstruct or restnct the mobility of or block the path

Hydronic Piping

BOCA CHAPTER 7 NMC COMM-1993 管路

The following is a listing of the standards referenced in this code, the effective date of the standard, the promulgating agency of the standard

Hydronic Piping

BOCA CHAPTER 16 NMC-1993 通风、

The fire prevention code official shall recommend to the chief administrative official of the municipality the location or relocation of new

Ventilation Air

BOCA CHAPTER 16 NMC COMM-1993 通风、

A person shall not willfully fail or refuse to comply with any lawful order or direction of the fire prevention code officiai or to interfere

Ventilation Air

CSA C22.2 NO 117-1970 UPD 2-2007 独立

Les modifications suivantes visant les articles 4.2.1.6, 4.2.2.4 et 6.19 et la figure 1 ont été approuvées

Climatiseurs individuels

TB/T 1804-2017 铁道车辆 机组

KS C 9306-2017

Air conditioners

KS C 9306-2017(2022

Air conditioners

TB/T 3493-2017 铁道车辆 压力保护装置

ASHRAE EQUIP SI CH 49-2008 室内和已包装终端

ROOM AIR CONDITIONERS AND PACKAGED TERMINAL AIR CONDITIONERS

CJ/T 134-2001 城市公交客车系统技术条件

The technical requirements for the air-conditioning system of urban transit buses

PN M52017-1986 技术设备..基本参数系列

Air technology installations Air conditioners Basic parameters series

ABNT NB-10-1951 设施

1. Esta Norma tem por objetivo estabelecer bases fundamentais para execu??o de instala??es de condicionamento de ar. As condi??es aqui estabelecidas s

BOCA IMC-2000 CHAPTER 12-2000 管路

APPENDIX A SYSTEM LAYOUT ILLUSTRATIONS

Hydronic Piping

BOCA IOTFDC-1998 CHAPTER 25-1998 管路

This appendix contains various illustrations and diagrams of typical applications of specific code provisions to one- and two-family dwellings

Hydronic Piping

BOCA CHAPTER 7 NMC-1993 管路

It shall be unlawful to interfere with, attempt to interfere with, conspire to interfere with, obstruct or restnct the mobility of or block the path

Hydronic Piping

BOCA CHAPTER 7 NMC COMM-1993 管路

The following is a listing of the standards referenced in this code, the effective date of the standard, the promulgating agency of the standard

Hydronic Piping

BOCA CHAPTER 16 NMC-1993 通风、

The fire prevention code official shall recommend to the chief administrative official of the municipality the location or relocation of new

Ventilation Air

BOCA CHAPTER 16 NMC COMM-1993 通风、

A person shall not willfully fail or refuse to comply with any lawful order or direction of the fire prevention code officiai or to interfere

Ventilation Air

CSA C22.2 NO 117-1970 UPD 2-2007 独立

Les modifications suivantes visant les articles 4.2.1.6, 4.2.2.4 et 6.19 et la figure 1 ont été approuvées

Climatiseurs individuels

检测流程
填写并提交定制服务需求表
技术评估和方案讨论
对选定的试验方法进行报价
合同签定与付款
按期交付检测报告和相关数据
想了解更多检测项目
请点击咨询在线工程师
点击咨询
联系我们
服务热线:400-635-0567
地址:北京市丰台区航丰路8号院1号楼1层121
邮编:10000
总机:400-635-0567
联系我们

服务热线:400-635-0567

投诉建议:010-82491398

报告问题解答:010-8646-0567-8

周期、价格等

咨询

技术咨询