服务热线:400-635-0567

扭转梁后桥检测

发布时间:2023-12-21 23:17:26

点击量:0

军工检测 其他检测

QC/T 1096-2018 乘用车用疲劳寿命台架试验方法

Bench test method for fatigue life of torsion beam rear axle for passenger cars

T/TMAC 003-2017 体装置

本标准规定了桥梁转体装置的术语和定义,规格、分类、型号、产品结构,技术要求,试验方法,检验规则,标志、包装、运输和储存

Bridge swivel device

DB41/T 2465-2023 灌注桩注浆技术规程

Technical regulations for post-grouting of bridge cast-in-place piles

DB35/T 1150-2011 土方机械驱动 疲劳试验方法

本标准规定了土方机械驱动桥桥壳进行扭转疲劳试验的术语和定义、试验原理、试验仪器及设备、试验环境、试验方法和试验报告。 本标准适用于采用非独立悬挂、全浮式半轴结构的轮胎式土方机械驱动桥桥壳

Torsional Fatigue Test Method for Drive Axle Housing of Earthmoving Machinery

ASME B30.2-2011 式和门式起重机(顶部运,单或多,顶部运架空吊车)

The document contains provisions that apply to the construction, installation, operation, inspection, testing, maintenance, and use of cranes

Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)

ANSI/ASME B30.2-2011 式和门式起重机(顶部运,单或多,顶部运架空吊车)

Volume B30.2 includes provisions that apply to the construction, installation, operation, inspection, and maintenance of hand-operated

Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)

T/YJB 0039-2022 体法施工技术规程

目次 1 总则 2 术语 3 基本规定 3.1 一般规定 3.2 跨越既有道路  3.3 跨越河道  3.4 跨越既有铁路 4 转动系统施工 4.1 一般规定

Technical Specification for Bridge Construction of Swivel Method

VSM 12771-1922 密封和路面

T/CECS G:D67-01-2018 公路灌注桩压浆技术规程

1. 总则;2. 术语和符号;3. 基本规定;4. 设计;5. 施工;6. 后压浆工程质量检验与评定

Technical Specification for Post-grouting of Cast-in-place Pile of Highway Bridges

T/CRS C0702-2021 铁路灌注桩压浆技术规程

1.明确了本规程的编制目的、适用范围,规定了铁路桥梁在应用桩基后压浆技术时设计、施工、验收中应遵循的主要原则和执行标准。 2.明确了铁路桥梁灌注桩后压浆设计、施工时应满足的基本要求。 3.明确了铁路桥梁灌注桩后压浆桩承载力、压浆管路系统构造要求、压浆材料的配比要求、压浆量和压浆压力估算公式的

Technical Specification for Post-grouting of Cast-in-place Pile of Railway Bridge

T/CECS G-D67-01-2018 公路灌注桩压浆技术规程

Post-grouting technical specification for cast-in-situ piles of highway bridges

T/CACEM 00011-2016 公路导轨动球型支座

4 分类、型号及结构形式 4.1 分类 4.1.1 按位移功能分为: a) 双向活动支座:具有竖向承载、竖向转动和双向滑移性能,代号SX; b) 纵向活动支座:具有竖向承载、竖向转动、纵向滑移和横向水平承载力性能,代号ZX; c) 

Spherical bearings with rotational guide rail for highway bridges

DB36/T 1816-2023 船撞损伤应急检测技术规程

Technical regulations for emergency detection of bridge damage after ship collision

T/CECS G:J51-02-2023 张预应力孔道压浆技术规程

本规程共分6章、2个附录,主要内容包括1总则、2术语、3材料与设备、4孔道压浆、5孔道补压浆、6质量控制与检验、附录A 压浆、补压浆施工记录表样、附录B 孔道压浆密实性雷达检测法

Technical Specifications for Grouting of Post-tensioned Bridges

DIVISION I 11.2-1996

Bridges

QC/T 1096-2018 乘用车用疲劳寿命台架试验方法

Bench test method for fatigue life of torsion beam rear axle for passenger cars

T/TMAC 003-2017 体装置

本标准规定了桥梁转体装置的术语和定义,规格、分类、型号、产品结构,技术要求,试验方法,检验规则,标志、包装、运输和储存

Bridge swivel device

DB41/T 2465-2023 灌注桩注浆技术规程

Technical regulations for post-grouting of bridge cast-in-place piles

DB35/T 1150-2011 土方机械驱动 疲劳试验方法

本标准规定了土方机械驱动桥桥壳进行扭转疲劳试验的术语和定义、试验原理、试验仪器及设备、试验环境、试验方法和试验报告。 本标准适用于采用非独立悬挂、全浮式半轴结构的轮胎式土方机械驱动桥桥壳

Torsional Fatigue Test Method for Drive Axle Housing of Earthmoving Machinery

ASME B30.2-2011 式和门式起重机(顶部运,单或多,顶部运架空吊车)

The document contains provisions that apply to the construction, installation, operation, inspection, testing, maintenance, and use of cranes

Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)

ANSI/ASME B30.2-2011 式和门式起重机(顶部运,单或多,顶部运架空吊车)

Volume B30.2 includes provisions that apply to the construction, installation, operation, inspection, and maintenance of hand-operated

Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)

T/YJB 0039-2022 体法施工技术规程

目次 1 总则 2 术语 3 基本规定 3.1 一般规定 3.2 跨越既有道路  3.3 跨越河道  3.4 跨越既有铁路 4 转动系统施工 4.1 一般规定

Technical Specification for Bridge Construction of Swivel Method

VSM 12771-1922 密封和路面

T/CECS G:D67-01-2018 公路灌注桩压浆技术规程

1. 总则;2. 术语和符号;3. 基本规定;4. 设计;5. 施工;6. 后压浆工程质量检验与评定

Technical Specification for Post-grouting of Cast-in-place Pile of Highway Bridges

T/CRS C0702-2021 铁路灌注桩压浆技术规程

1.明确了本规程的编制目的、适用范围,规定了铁路桥梁在应用桩基后压浆技术时设计、施工、验收中应遵循的主要原则和执行标准。 2.明确了铁路桥梁灌注桩后压浆设计、施工时应满足的基本要求。 3.明确了铁路桥梁灌注桩后压浆桩承载力、压浆管路系统构造要求、压浆材料的配比要求、压浆量和压浆压力估算公式的

Technical Specification for Post-grouting of Cast-in-place Pile of Railway Bridge

T/CECS G-D67-01-2018 公路灌注桩压浆技术规程

Post-grouting technical specification for cast-in-situ piles of highway bridges

T/CACEM 00011-2016 公路导轨动球型支座

4 分类、型号及结构形式 4.1 分类 4.1.1 按位移功能分为: a) 双向活动支座:具有竖向承载、竖向转动和双向滑移性能,代号SX; b) 纵向活动支座:具有竖向承载、竖向转动、纵向滑移和横向水平承载力性能,代号ZX; c) 

Spherical bearings with rotational guide rail for highway bridges

T/CECS G:J51-02-2023 张预应力孔道压浆技术规程

本规程共分6章、2个附录,主要内容包括1总则、2术语、3材料与设备、4孔道压浆、5孔道补压浆、6质量控制与检验、附录A 压浆、补压浆施工记录表样、附录B 孔道压浆密实性雷达检测法

Technical Specifications for Grouting of Post-tensioned Bridges

DB36/T 1816-2023 船撞损伤应急检测技术规程

Technical regulations for emergency detection of bridge damage after ship collision

DIVISION I 11.2-1996

Bridges

检测流程
填写并提交定制服务需求表
技术评估和方案讨论
对选定的试验方法进行报价
合同签定与付款
按期交付检测报告和相关数据
想了解更多检测项目
请点击咨询在线工程师
点击咨询
联系我们
服务热线:400-635-0567
地址:北京市丰台区南三环西路16号2号楼27层
邮编:10000
总机:400-635-0567
联系我们

服务热线:400-635-0567

投诉建议:010-82491398

报告问题解答:010-8646-0567-8

周期、价格等

咨询

技术咨询